Troy Dr,
Los Angeles
About the project
This Los Angeles kitchen remodeling project takes a fresh approach to contrast, symmetry, and texture. Full-height white shaker cabinets introduce vertical continuity, while a bold island wrapped in patterned blue-and-white tile defines the layout with personality. A saturated, patterned tile wraps the island base and extends to the floor, anchoring the space with confident rhythm. The result is both sculptural and soft, bright and grounded. A professional-grade stainless steel range and double oven deliver performance without compromising the design.
Before and During Remodeling
After Remodeling
YOU ASK, WE ANSWER
A typical kitchen remodeling project in Los Angeles takes 6–10 weeks, depending on scope and permitting. Custom elements and structural changes may extend that timeline.
Custom cabinetry and countertops tend to account for the largest portion of a kitchen remodel budget, followed by appliances and labor.
Mid-range kitchen remodeling in Los Angeles often starts at $40,000–$75,000. High-end projects with custom finishes and premium appliances may exceed $100,000.
Yes, most kitchen remodeling work in Los Angeles that involves plumbing, electrical, or layout changes requires a building permit. Kitchen remodel contractors handle all permitting as part of their design and build process.